If the weather cooperates, on Sunday afternoon I plan on trying to get the new, unfinished jump line into a rideable condition. I've already connected it to the original gully jump-line, but that trail has seen some serious damage from these torrential rains. It will requires some weed-whacking, then creation of some grade reversals to get the water off the trail and repair/rerouting of the damaged sections. If there is time, reworking a couple of the old jumps. I will be out there by 1:00 and will go until the weather, mosquitos, or my desire to get some riding in force me to quit. Anyone who feels like helping is welcome to join.