I got out and worked on the old-school stuff this morning. The Switchbacks, The Island, and the Small Switchbacks are all trimmed and blown. Long's Short is cleared of many downed trees and is blown and rideable. Deer Run is out of commission until someone wants to put some time into it; the top third got wrecked when the mini-ex was driven down it to install some electrical something-or-other. I think there is room to do something more interesting than what was there before, but that's pretty low on my priority list.
I think we could improve the switchbacks by staying in the woods all the way to Hill 5, then crossing Hill 5 a little higher. It would be more interesting, and stay out of the marshy area at the bottom. Also low on my priority list, but it's a smaller project, so I could be talked into spending some time to make that happen if we had a couple people willing to help out.
Weeds are not terrible yet, but will need to be trimmed in a couple weeks, so start thinking about it.